Project Overview
For the CEMEX unloading terminal at the Port of Paris, ILC delivered a complete barge-positioning system designed to control the movement of 2,500-tonne river barges during unloading operations. The project included a fully integrated “turnkey” installation, from mechanical integration to electrical commissioning on site.
Scope of Supply
- Two electric hauling winches, 10,000 daN
- Two custom-fabricated fairleads
- One thermo-hydraulic power unit
- Turnkey installation, including on-site mechanical integration and full electrical setup
Project Information
- Category: River & Inland Waterways
- Year of Manufacture: 2020
- Production Lead Time: 12 weeks