Project Overview
For the renovation of the Bernières unloading quay, ILC supplied a complete electric mooring and barge-positioning system for LAFARGE HOLCIM. The solution was engineered to handle high traction loads while ensuring safe, controlled movement of 2,500-tonne river barges during unloading operations.
Scope of Supply
- Four electric hauling winches, 10,000 daN
- Two electric capstans, 5,000 daN
- Four custom-fabricated fairleads
- One thermo-hydraulic power unit
Project Information
- Category: River & Inland Waterways
- Year of Manufacture: 2017
- Production Lead Time: 12 weeks